New Shingle Roof in Towson: What the Install Involves
A new shingle roof is installed in six stages: tear-off, deck inspection, underlayment and edge protection, flashing, shingles, and cleanup. How long it takes depends on size, roofline and weather. Knowing the stages helps you spot what a quote leaves out.
1. Tear-off
The crew strips the old shingles, underlayment and old nails down to the deck. A full tear-off is the only way to see what is underneath. Our roof tear-off vs overlay page covers the choice in more detail.
2. Deck inspection
Soft, stained or split decking gets replaced before anything new goes down. This is the step most likely to change the final bill, so read how rotted decking is handled before you sign.
3. Underlayment and edge protection
Underlayment is the water barrier under the shingles. Many installers also add a self-sealing membrane along eaves and in valleys, where ice and wind-driven rain do the most damage. Ask what your quote includes.
4. Flashing
Chimneys, vents, walls and valleys need new flashing. Old flashing reused on a new roof is a common source of later leaks. Ask whether flashing is replaced or reused.
5. Shingles
Shingles are laid from the eave up, with fasteners placed where the manufacturer specifies. Asphalt shingles are the common choice. Architectural shingles add thickness and a dimensional look. Ridge vents or other ventilation parts go in at this stage.
6. Cleanup and walk-through
The crew should sweep the yard with a magnet for nails, remove debris and walk the roof with you. Photos of the finished work are a useful record.
What to confirm before work starts
- Written material name and line, not just 'architectural shingles'.
- Who applies for any county permit.
- How decking repairs are priced.
- Warranty terms in writing, both the material and the workmanship.
Planning ahead
If you live in Timonium or nearby, tree cover over your roof matters. Shade keeps shingles damp, so ask about algae-resistant options. For how the total is built up, see what sets the price of a roof replacement.
What the homeowner should do before install day
Move cars out of the driveway and away from the street frontage the crew will use. Take down anything fragile hanging on walls, since hammering transmits through the house, and cover or move items stored in the attic, where dust and debris can fall. Mark sprinkler heads and tell the crew where pets and children will be. If you have a satellite dish or solar panels, ask who will remove and reinstall them.
Weather and scheduling
Shingles are installed in dry conditions, and very cold or very hot weather affects how well sealing strips activate and how the crew works. If rain is forecast mid-job, a good crew dries the roof in, with underlayment and tarps, before leaving. Ask in advance what the plan is if weather changes the schedule.
Choosing between shingle types
Shingle choice is covered in asphalt shingle types.
Signs the install is going well
A careful crew lays tarps over landscaping, protects air conditioners and walkways, keeps materials staged neatly, and checks the roof at the end of each day for exposed areas. Ask to see photos of any decking repairs before the new layers cover them up. After the job, keep the contract, warranty papers and photos in one folder.
What a crew will usually ask you about
Expect questions about where to place the dumpster, where the crew can park, and which side of the house gets the most foot traffic. Tell them about septic lines, underground utilities or fragile plantings near the foundation. Mention any past leaks and where they appeared, because those spots deserve extra attention at tear-off.
Questions to ask on day one
Confirm the start date, the expected finish date, and how the crew will handle a weather delay. Ask who the on-site lead is and how you will be told about any decking repair before it happens. To book an inspection first, call Towson Roof Co at (410) 438-1686.